Electric Vehicle Charging Station Contractor Thurgoona, NSW
We check your switchboard before you buy the charger, and give you the answer in writing.
or call (02) 6022 4003
AS/NZS 3760 & 3012
AS 2293 Compliance Reporting
Licensed NSW & VIC
ISO 9001 & 45001 Certified
24-Person Local Team
The switchboard question is easier to answer before the car arrives than after it. Plenty of people call an EV charger installer once they've already bought the charger.
BOSCHETTI answers it first. Home EV charger installation here starts with what your supply will actually carry, and often ends with the discovery that no upgrade is needed at all.
What does an EV charging contractor do in Thurgoona?
An EV charging contractor assesses your switchboard and supply, then installs and commissions home or workplace charging. BOSCHETTI covers single- and three-phase, load management, the network application where a supply upgrade is needed, and the Level 2 work at the street, which stays in-house.

Home EV Charger Installation
Households out at Table Top and Barnawartha North run close to three vehicles on average, on properties where the garage is far from the switchboard.
We install single- and three-phase home charging with built-in load management, so the charger works alongside the oven, the air conditioner and everything else rather than tripping the main. The cable run goes in the wall, not across it.

EV Charger Switchboard Assessment
Nearly any house can take a charger. What matters is whether your supply can carry it while everything else is running.
We assess the board and the supply before you commit to a charger, and put the cost of any upgrade in the written answer. Sometimes the answer is that load management handles it and nothing needs upgrading.
Three Phase Power Upgrades
Adding a charger, ducted air conditioning, a workshop or a battery to a single-phase house eventually reaches the limit of a single-phase supply, and that limit is in the supply from the street rather than in the board.
A three-phase upgrade runs from the network side through to the board, including the application with Essential Energy or AusNet and the Level 2 work in between, handled by one business.

Commercial EV Charging Installation
Workplaces, motels and councils are fitting charging for reasons that have little to do with any one driver: staff retention, guest expectation, fleet transition.
We install from a single bay to a managed bank, including metering, load sharing across bays and the supply upgrade underneath it, so the site can add capacity later without starting again.
What EV Owners Around Thurgoona Say
Thinking about an EV? Ask about the switchboard first.
Assessment in writing before you buy. Level 2 accredited. Phone (02) 6022 4003.






